دکتر ژوبین معتمد

فرستادن به ایمیل چاپ مشاهده در قالب PDF

 

Jubin Motamed

Oct71 to July 1974   Queen Mary College    BSc Civil Engineering

Oct74 to July 1975   University of Surrey, Guildford,   Postgraduate

Feb95 to Feb 1997   University of Westminster, (MSc)Structural

2003to Sept 2009    University of Westminster,    Doctor of Philosophy

Languages: Fluent in English & Farsi. Adequate in French

Research papers:

High Strength / High Performance Concrete in Leipzig, Germany (2002).  Earthquake Engineering papers on Bam for EEFITand in Isfahan (2003), Kerman (2004), Qom (2005), Tehran Retrofit ( 2006), SEE5(2007)  and a number of other papers.

ComputerLiteracy:Microsoft Office, Auto Cad 2000 and Ansys Structural Analysis

Safetytraining:First Aid at Work certificate from St John’s Ambulance,  General Safety and  Safety Management Training Course from theBritish Safety Council.

EmploymentHistory:

July99 – Sept 2008- Pantheon House Ltd, Resident Engineer for  Lodge Park School in Corby .     20 houses  in Balham. conversion of an old brewery into52 luxury flats in Borough. 17 slab foundations for generators for EnergyDevelopment in Stranford le-hope. 103 timber frame houses  in Hertford. Indoor pool and spa extension of a grade II listed BroxbourneburyMansion. 103 units of social housing flats in Uxbridge. 6 no  six bedroom houses in Northwood.  88 council flats in Ealing. 54  flats and houses in Hounslow. RC bridge at Grove Mill Lane.  WSP Consulting Group, 36 storey Barclay’s BankRC structure in Canary Warf. Fitzpatrick Contractors Ltd, RC base, roof slabsand walls of the cafe and public toilets in Trafalgar Square.

Industrialsteel structure for Big Yellow Self Store in Tolworth. 108 flats, in Alperton. AmecGroup,  Hospital in Midland

Feb97 – July 98- Pantheon House Ltd, Project Director, Royal Marsden NHS Trust,Fulham Rd, London SW3 6JJ Execution of Phase I & II Entrance and Refurbishmentof Wilson ward for the Royal Marsden Hospital, Fulham Road.

Testingof 13 reinforced concrete beams resulting in an MSc & a paper  submitted to Leipzig. Professor Emeritus P.ERegan published his paper in The Structural Engineer, 2004 with two referencesto my research

Sept94 – Feb 96            John Mowlem, TimeLife Building, New Bond St, London W1                              Setting out engineer for the new building inBond Street, new BBC building in White City and renovation of NationalWestminster Bank, EC2

June93 – Jan 94 Zussman BearPartnership, 4 Charlotte Rd, London EC2A 3DH   Design ofunderpinning, retaining wall, load bearing walls and  temporary supports.

June92 – June 93   Crendon ConcreteLtd, Long Crendon, Bucks HP189BB   Precast concrete system housing methodfrom Building Research Establishment

Dec81  - Jan 92 Feba Precast Concrete Ltd, Km 6, Magsous Rd, Tehran, Iran   Director of a precast concrete factoryproducing prestressed joists and blocks .

Sept78 – June 81   Iran EpronConstruction Ltd, 73 Delaviz St, Tehran, Iran    Project manager for 40 km roadwork with underpasses, culverts and bridges, Persian Gulf. Sarzeh-MaramRoad,which  branchs off fromSirdjan-Bandar Abbas Main Road

July77 – June 78     Feba PrecastConcrete Ltd, Km 6, Magsous Rd, Tehran, Iran .  management of a precast concrete factoryproducing prestressed joists and blocks

July75-   July 77 Iranian Airforce,  Resident Engineer for multi storeyresidential buildings for officers and offices in Tehran airport.

Sample Image

 

صفحه ی کنونی: درباره ما اعضای هیئت علمی دکتر ژوبین معتمد